Sakhalinka 53

The turn-key project on restoration of the killed well No. 53 of Sakhalinske oil and gas condensate field was successfully completed.

Well production rate - 70 thousand cubic meters of gas per day.

THE PERFORMED WORKS:

The Ø146 mm casing pipe was brought to the depth of 3,615 m.

In order to deepen the well up to 4,400 m with horizontal displacement of 250 m, the productive pipe bottom (stop ring, return valve, drill shoe) was drilled out with a Ø121 mm flat bottom mill.

The well was drilled to the depth of 3,638 m.

The drilling of inclined side well shaft was performed from the depth of 3,638 m with Ø120.6 bits.

Quotations

Twitter

navigator__k В США началась крупнейшая за 35 лет забастовка нефтяников. И Баррель нефти Brent подорожал до 56 долларов. http://t.co/sgKWI0aFpZ
navigator__k "Ой все": JKX Oil & Gas прекращает инвестиции в Украине из-за повышения налогов. http://t.co/cHJoPdwUeT . http://t.co/eY0nRZvKsC

Navigator Komplekt, LLC

The Company provides gas and oil wells drilling, integrated repair of drilling stations, restoration of wells by side-tracking method, drilling projects management.

03680 Kyiv, Palladin Ave, 44

Tel.: +380 (44) 500-85-64

   

JoomShaper
// google analytics