The turn-key project for restoration of killed well No. 97 of Yablunivske oil and gas condensate field by method of side-tracking from Ø168 mm casing pipe.

PROJECT IMPLEMENTATION STAGES

Window cutting in Ø168 mm casing pipe at the depth of 3,395-3,398 m.

Drilling of the inclined side shaft in the interval of 3398-3,614 m with horizontal end in the interval of 3,614-3,949 m.

Well casing with a Ø114 mm shank with a filter in the productive stratum.

Project lead time – 90 days

Oil capacity before side-tracking – 0 t

Oil capacity after side-tracking – 15-20 t of oil/day

Quotations

Twitter

navigator__k В США началась крупнейшая за 35 лет забастовка нефтяников. И Баррель нефти Brent подорожал до 56 долларов. http://t.co/sgKWI0aFpZ
navigator__k "Ой все": JKX Oil & Gas прекращает инвестиции в Украине из-за повышения налогов. http://t.co/cHJoPdwUeT . http://t.co/eY0nRZvKsC

Navigator Komplekt, LLC

The Company provides gas and oil wells drilling, integrated repair of drilling stations, restoration of wells by side-tracking method, drilling projects management.

03680 Kyiv, Palladin Ave, 44

Tel.: +380 (44) 500-85-64

   

JoomShaper
// google analytics